---
title: Version 6 of the GCCA EPD Tool | What is new
description: "Version 6 of the GCCA EPD Tool: openLCA engine, GNR 2023 data, latest North American cement PCR and an Australian configuration. What existing users need to know."
image: https://gccaepd.org/hs-fs/hubfs/photo%20competition/CBD88-Ratih%20Retna%20Maya-Indonesia.jpg?width=1600&name=CBD88-Ratih%20Retna%20Maya-Indonesia.jpg
---

[Skip to content](https://gccaepd.org/version-6#main-content)

[![GCCA](https://gccaepd.org/hubfs/GCCA%20logos/GCCA_RGB_blue.svg)](https://gccaepd.org/?hsLang=en)

[Home](https://gccaepd.org/?hsLang=en) [EPD Tool](https://gccaepd.org/tool?hsLang=en) [Version 6](https://gccaepd.org/version-6?hsLang=en) [Verification](https://gccaepd.org/verification?hsLang=en) [Pricing](https://gccaepd.org/pricing?hsLang=en) [Learn](https://gccaepd.org/learn?hsLang=en) 

[Get a demo](https://gccaepd.org/get-a-demo?hsLang=en)

Now live · 1 September 2026

# Version 6

> A new calculation foundation for credible, consistent and digitally connected EPDs for cement, concrete and precast.

[Request a demo](https://gccaepd.org/get-a-demo?hsLang=en)[Client login](https://tool.gccaepd.org)

![Concrete in the built environment](https://gccaepd.org/hs-fs/hubfs/photo%20competition/CBD88-Ratih%20Retna%20Maya-Indonesia.jpg?width=1600&name=CBD88-Ratih%20Retna%20Maya-Indonesia.jpg)

#### What is new

## A controlled platform renewal, not a feature release.

The familiar workflow stays. Underneath it, a new calculation engine, updated methodological content and digitally connected outputs.

openLCA at the core*Engine*

A stronger, more transparent and scalable calculation engine, and the technical basis for digital integration and future system connections.

GCCA GNR 2023 data*Sector data*

The latest industry dataset, collected to the CO₂ and Energy Accounting and Reporting Standard for the Cement Industry.

Latest cement PCR*North America*

Incorporates the current North American Product Category Rules for Portland, blended, masonry, mortar and plastic cements.

Australian configuration*Regional*

Alongside the standard setup, Version 6 includes a dedicated Australian configuration using Australian background data, so plants in Australia can calculate EPDs on local data in the same tool.

Pre-verified tool*Verification*

Version 6 is listed as a pre-verified LCA tool by the International EPD® System, so EPDs calculated with it follow the simplified verification route and the verifier checks your data rather than the model.

ILCD+EPD and API*Digital outputs*

Results leave the tool as structured, machine-readable data, so EPDs can feed procurement, ratings and building LCA systems directly.

#### Improved modelling

**Material properties**More detailed material properties and updated background data.

**Electricity by voltage**Low, medium and high voltage electricity modelled separately.

**Mixing trucks**Electricity inputs for mixing trucks are now captured.

**Construction electricity**Regionalised electricity data for construction-stage activities.

**Recarbonation**Refined calculation logic for concrete recarbonation in use.

**Architecture**Updated for system connections and digital workflows.

#### For existing users

## Your login has not changed.

01**Log in as usual** at tool.gccaepd.org with your current username and password.

02**Parallel running.** The previous version and Version 6 run side by side for six months, so work in progress can be finished where it started. You can still log in to Version 5.2 at [**concrete-epd-tool.org**](https://concrete-epd-tool.org).

03**Expect some result changes.** Updated data, PCRs and modelling detail mean results for the same inputs may differ from Version 5.2.

04**Read the documentation.** Updated user guide, LCA model report, database and verification reports are in the documentation library.

[Documentation](https://gccaepd.org/epd-tool-documentation?hsLang=en)

Migration guide

### Moving from Version 5.2 to Version 6

What changed underneath, what to re-check on existing EPDs, and a four-week plan that fits inside the parallel run.

[**Download Guide 7 (PDF)**](https://gccaepd.org/hubfs/Guides/Guide%207.pdf?hsLang=en)

#### Why it matters now

## EPDs are becoming regulated, machine-readable product data.

ISO 14025:2026*Published*

The second edition sets explicit requirements for EPD tools and their independent verification, and tightens impartiality rules. The tool you calculate with matters.

Revised EU CPR*In force*

Regulation (EU) 2024/3110 provides for environmental performance and digital construction product information, with detail following in delegated acts.

Digital product data*Developing*

Procurement, ratings and building LCA increasingly need structured data. Version 6 is built to feed those systems, through ILCD+EPD and the API.

## See Version 6 in action

A tailored demonstration around your products, markets and EPD requirements. Existing clients with questions about migration can contact the team directly.

[Request a demo](https://gccaepd.org/get-a-demo?hsLang=en)

[Contact us](https://gccaepd.org/contact?hsLang=en)  ·  [Read the launch note](https://gccaepd.org/blog/gcca-epd-tool-version-6-is-now-live?hsLang=en)

[![GCCA](https://gccaepd.org/hubfs/GCCA%20logos/GCCA_RGB_blue.svg)](https://gccaepd.org/?hsLang=en)

[EPD Tool](https://gccaepd.org/tool?hsLang=en) [Version 6](https://gccaepd.org/version-6?hsLang=en) [Verification](https://gccaepd.org/verification?hsLang=en) [Pricing](https://gccaepd.org/pricing?hsLang=en) [Learn](https://gccaepd.org/learn?hsLang=en) [Blog](https://gccaepd.org/blog?hsLang=en) [Documentation](https://gccaepd.org/epd-tool-documentation?hsLang=en) [Client login](https://tool.gccaepd.org)

© 2026 Global Cement and Concrete Association