Ready-mixed concrete producers rarely know how their concrete will be placed, or where it will end up. Yet a cradle-to-grave EPD asks for both. This article explains how the GCCA EPD Tool handles modules A5 and B1 when that information is missing.
Photo: Pexels
Yes. The tool provides a default A5 scenario for ready-mixed concrete, per cubic metre. It is meant for producers without site-specific data.
The tool pre-fills these A5 inputs:
You can see the current default values on the "A4-5. Construction" screen of the tool. Pumping, placing and compaction are not entered separately. They are covered by the default energy and fuel inputs. Concrete losses follow the same end-of-life scenario as the product itself.
The defaults are based on representative background LCA data and industry input on typical installation losses. They are documented in the LCA Model report provided with the tool.
Yes, but only if you have better data, such as project or regional figures. Any values you enter yourself need to be justified to your verifier.
Concrete slowly absorbs CO₂ from the air during its life. This is called carbonation or recarbonation. The tool models it in line with EN 16757 and offers three approaches.
In the default approach, you only select the type of structure. Service life, exposed surface, exposure and carbonation rate are not inputs. The properties of your concrete, such as its cement content and composition, come from the product description you have already entered. The default approach is intended for elements with a relatively high exposed surface.
For background on carbonation, read Recarbonation of Concrete: From EPDs to Whole-Life Carbon Accounting. To see the tool in action, request a demonstration.